Jump to content

Service guide ยท Stockton

Residential electrical panel upgrade, from 100 amp to 200 amp

A house service upgrade raises the amp rating of the whole electrical service, not just the panel. This page explains when a Stockton house needs it, and the PG&E and city steps that come with it.

  1. Fill in the form. It takes about two minutes.
  2. A local specialist gets in touch. They ask a few questions and quote.
  3. You choose. Go ahead only if the price suits you.
a residential electrical service panel with a closed gray door and neatly labeled breakers in a garage wall

Request an electrician quote

A few details about the job, and a local specialist will contact you with a price.

Needed so the business can price the job properly.

A residential electrical panel upgrade for a house usually means moving from a 100-amp service to a 200-amp service, so the house can carry modern loads. It is more than a new panel. It can involve the meter base, the wires from the street, a permit, an inspection and PG&E. National price guides put a panel swap at roughly $1,500 to $4,000 and utility-side work on top. This page covers when a house needs the bigger service and the order of steps. The broader decision guide is on the electrical panel upgrade page.

When does a house need a 200-amp service?

A house needs a bigger service when the loads you plan to run together can exceed what the current service can safely carry. The usual triggers are an EV charger, a heat pump, an accessory dwelling unit, solar with batteries, a large addition, an electric range and dryer, or a hot tub.

An electrician decides this with a load calculation under the California Electrical Code. It adds up lighting, appliances, heating and cooling, and the new load, and compares the result with the service rating. Sometimes the calculation shows a 100-amp service is still enough. Sometimes load management or a smaller change fits, so ask before assuming you need a full upgrade.

Common triggers in Stockton homes:

  • EV charger. A Level 2 charger usually needs its own dedicated 240-volt circuit. See EV charger installation for what that involves.
  • Heat pump or electric furnace. Replacing gas heat or adding cooling raises the peak load.
  • ADU or addition. A second dwelling or a large addition often means a new subpanel or a bigger service.
  • Solar and batteries. The service rating and the main breaker affect how much you can connect.
  • Hot tub. A spa needs a dedicated circuit. The hot tub electrician page covers it.

What does a residential electrical panel upgrade involve?

A residential panel upgrade replaces the main panel and, if the service is growing, the service equipment that feeds it: the meter socket, the service entrance conductors and the grounding. The electrician usually pulls the permit, coordinates the power shutoff, swaps the panel, reconnects the circuits and arranges the inspection.

If you stay at the same amp rating, the work is shorter. If you go from 100 to 200 amps, the wire from the meter often changes, and PG&E may need to upgrade its transformer or service line. Your electrician should tell you which case you are in before quoting.

A typical sequence:

  1. Walk-through and load calculation.
  2. Permit from the City of Stockton or San Joaquin County, depending on where the house is.
  3. Application to PG&E if the service size or meter equipment changes, and a disconnect request.
  4. Power off, panel and service equipment replaced.
  5. Local inspection, then PG&E reconnects.

What do PG&E and the city require?

PG&E handles the utility side through its Your Projects portal. Replacing a panel, like-for-like or larger, falls under its "change existing electric service" process. The city or county issues the electrical permit and inspects the work, and PG&E reconnects the meter after the inspection passes.

a residential electrical service panel with a closed gray door and neatly labeled breakers in a garage wall

PG&E says a job owner contacts you within five business days of an application. You or your contractor provide scope, timeline and appliance loads. Mandatory documents are due within 35 calendar days, and the review should finish within 66 calendar days. After the design, you sign a contract. PG&E says it covers things like the transformer replacement, metering equipment and underground conductors needed for the new capacity, while you pay for trenching and permits. For a disconnect and reconnect, PG&E says to expect about 30 business days to schedule, and someone 18 or older must be home if PG&E needs indoor access to the meter.

On the city side, San Joaquin County states that replacing or repairing an electrical service panel needs a permit. The City of Stockton issues permits for houses inside city limits through its Community Development Department. Which one applies depends on the address, so your electrician should confirm.

What affects the price of a residential electrical panel upgrade?

The biggest price drivers are the service size, whether the meter base and service wires change, how far the panel is from the meter, and the permit. National price guides show a main panel replacement at about $1,500 to $4,000 and a full service upgrade with a new meter base at roughly $2,500 to $6,000.

ItemTypical range, national price guides
Main panel replacement$1,500 to $4,000
Full service upgrade with new meter base$2,500 to $6,000
Subpanel$500 to $1,500
Whole-home surge protector$200 to $800

These are guides, and your electrician's written quote overrides them. Trenching, moving the panel, old wiring and finishing the wall are common extras. The cost breakdown is on the panel replacement cost page.

Is a 200-amp upgrade always the right choice?

No. Some houses are fine at 100 or 150 amps. A 200-amp service is a common modern size, but a smaller upgrade, a subpanel or load management may cover your new loads for less. Ask the electrician to show the load calculation, not just the answer.

PG&E also lists meter socket adapters as an alternative to a panel upgrade for eligible customers connecting solar, storage or EV chargers. Eligibility depends on the equipment, so ask your electrician whether it applies.

If you do upgrade, think about surge protection at the same time. A whole-house surge protector rated for the service installs at the panel. No brand is recommended here, because the right one depends on your panel and the manufacturer's listing.

What signs say you need a residential electrical panel upgrade?

You likely need one if breakers trip under normal use, the panel is full, lights dim when large appliances start, the panel is hot or scorched, or the house still has fuses. A planned EV charger, heat pump or addition is also a sign, even if nothing is wrong yet.

Check why a breaker keeps tripping first. A tripping breaker is often a single bad circuit. If the panel is damaged, smells burnt or sparks, stay away from it and call 911 or PG&E at once. Do not open it.

Who can do the work, and can I pull the permit myself?

For work done for you, California law requires a contractor who holds a C-10 electrical license from the Contractors State License Board. The small-job exemption, now $1,000 for labor and materials, does not cover work that needs a permit, and a panel upgrade does.

Owners of their own home may be able to pull a permit as an owner-builder, with conditions. The wires that feed the meter stay live from the utility side, and only PG&E or its authorized contractors may disconnect or reconnect PG&E facilities. For most people, the safest route is to get quotes and ask each electrician who handles the permit and the PG&E request. How to choose an electrician lists what to check. If you are in Stockton, send the quote form and local electricians can respond.

Questions people ask

How long does a residential electrical panel upgrade take?

The on-site work is often a day for a like-for-like swap, and longer for a service upgrade. The calendar time is longer because of permits, the PG&E application and scheduling. PG&E says a disconnect and reconnect takes about 30 business days to schedule, so plan for weeks, not days.

What should I ask before I hire someone for a panel upgrade?

Ask for the C-10 license number and check it on the CSLB site. Ask who pulls the permit, who requests PG&E's disconnect, whether the quote includes the meter base and trenching, what happens if the inspection fails, and how the new panel will be labeled. Get the answers in writing.

Do I need to be home for a panel upgrade?

Someone aged 18 or older often needs to be home, and PG&E says someone 18 or older must be present if it needs indoor access to the meter. You will also have no power for part of the day, so plan for fridge, medical devices and work from home. Ask for the shutoff window ahead of time.

Is it cheaper to upgrade the panel and the service together?

Usually yes, because the shutoff, permit and inspection happen once. Doing the panel now and the service later means paying for a second shutoff and a second inspection. If you expect an EV charger or heat pump soon, ask for both options priced side by side. A quick way to compare is the panel replacement cost guide, and the electrician in Stockton can quote both.

Sources used

Last changed